ENTRY D0665 20110918 D080D066500000001 SUBENT D0665001 20110918 D080D066500100001 BIB 11 16 D066500100002 TITLE Nuclear data measurement of 186Re production via D066500100003 various reactions D066500100004 AUTHOR (P.S.Bidokhti, M.Sadeghi, B.Fateh, M.Matloobi, D066500100005 G.Aslani) D066500100006 INSTITUTE (3IRNIRN) Islamic Azad University, Tehran D066500100007 (3IRNKRJ) D066500100008 REFERENCE (J,NET,42,600,2010) D066500100009 FACILITY (CYCLO,3IRNKRJ) Cyclone-30 (IBA, Belgium) D066500100010 SAMPLE Tungsten pellets placed into the copper backings D066500100011 DETECTOR (HPGE) Canberra model GC1020-7500SL D066500100012 METHOD (ACTIV) Irradiated for 1 hr by 5 uA proton beam D066500100013 COMMENT Mahdi Sadeghi (2011-09-15): D066500100014 - Physical thick target yield is given. D066500100015 STATUS (APRVD) Approved by Mahdi Sadeghi (2011-09-22) D066500100016 HISTORY (20110915R) On. Data (incl. error) from Mahdi Sadeghi. D066500100017 (20110918C) On D066500100018 ENDBIB 16 0 D066500100019 NOCOMMON 0 0 D066500100020 ENDSUBENT 19 0 D066500199999 SUBENT D0665002 20110918 D080D066500200001 BIB 4 4 D066500200002 REACTION (74-W-0(P,X)75-RE-186,,TTY,,PHY) D066500200003 DECAY-DATA (75-RE-186,90.64HR,DG,137.,0.09) D066500200004 ERR-ANALYS (ERR-S) Statistical uncertainty D066500200005 STATUS (TABLE) Table 3 of Nucl.Eng.Technol.42(2010)600 D066500200006 ENDBIB 4 0 D066500200007 NOCOMMON 0 0 D066500200008 DATA 4 5 D066500200009 EN-MAX EN-MIN DATA ERR-S D066500200010 MEV MEV MBQ/MUAHR MBQ/MUAHR D066500200011 15. 7. 0.88 0.05 D066500200012 17.5 7. 1.12 0.11 D066500200013 20. 7. 1.36 0.11 D066500200014 22.5 7. 1.61 0.11 D066500200015 25. 7. 1.91 0.15 D066500200016 ENDDATA 7 0 D066500200017 ENDSUBENT 16 0 D066500299999 ENDENTRY 2 0 D066599999999