ENTRY E2149 20230406 E214900000001 SUBENT E2149001 20230406 20231011 E214900100001 BIB 9 33 E214900100002 TITLE Reaction cross sections at intermediate energies and E214900100003 Fermi-motion effect E214900100004 AUTHOR (M.Takechi, M.Fukuda, M.Mihara, K.Tanaka, T.Chinda, E214900100005 T.Matsumasa, M.Nishimoto, R.Matsumiya, Y.Nakashima, E214900100006 H.Matsubara, K.Matsuta, T.Minamisono, T.Ohtsubo, E214900100007 T.Izumikawa, S.Momota, T.Suzuki, T.Yamaguchi, E214900100008 R.Koyama, W.Shinozaki, M.Takahashi, A.Takizawa, E214900100009 T.Matsuyama, S.Nakajima, K.Kobayashi, M.Hosoi, T.Suda,E214900100010 M.Sasaki, S.Sato, M.Kanazawa, A.Kitagawa) E214900100011 INSTITUTE (2JPNOSA,2JPNIPC,2JPNNII,2JPNSUU,2JPNIRS) E214900100012 (2JPNJPN) Fukui University of Technology, Fukui E214900100013 (2JPNJPN) Kochi University of Technology, Kami, Kochi E214900100014 (2JPNJPN) Ritsumeikan University, Shiga E214900100015 REFERENCE (J,PR/C,79,061601,2009) E214900100016 Main reference. See also TITLE and AUTHOR. E214900100017 (J,EPJ/A,25,(S1),217,2005) E214900100018 (T,TAKECHI,2005) E214900100019 (R,AIP-1238,270,2010) E214900100020 SAMPLE - Chemical-form of target is element. E214900100021 - Physical-form of target is solid. E214900100022 METHOD (EDE) E214900100023 FACILITY (SYNCH,2JPNIRS) Heavy Ion Medical Accelerator in Chiba E214900100024 (HIMAC) E214900100025 DETECTOR (SI,NAICR) To identify outgoing particle E214900100026 HISTORY (20090625C) Nf E214900100027 (20090901R) Received by e-mail from M.Takechi E214900100028 (20100204A) Nf. TITLE and AUTHOR corrected E214900100029 (20100603A) Tsubakihara. REFERENCE: E214900100030 J,PR/C,79,061601,2009 added E214900100031 (20100716A) Tsubakihara, REFERENCE: AIP-1238,270,2010 E214900100032 added E214900100033 (20230406A) MA. REFERENCE in 001 was modified. (EPJ/AS E214900100034 -> EPJ/S) E214900100035 ENDBIB 33 0 E214900100036 NOCOMMON 0 0 E214900100037 ENDSUBENT 36 0 E214900199999 SUBENT E2149002 20100816 E063E214900200001 BIB 4 10 E214900200002 REACTION (4-BE-9(6-C-12,NON),,SIG) E214900200003 PART-DET (6-C-12) E214900200004 ERR-ANALYS (ERR-T) Total uncertainty E214900200005 (ERR-SYS) Total systematic uncertainty E214900200006 (ERR-1) Uncertainty due to target thickness E214900200007 (ERR-2) Uncertainty due to inelastic scattering E214900200008 (ERR-3) Uncertainty due to 11C production E214900200009 (ERR-4) Uncertainty due to 10C and 13C production E214900200010 (ERR-S) Statistical uncertainty E214900200011 STATUS (TABLE) Plotted in Fig.1 of J,PR/C,79,061601,2009 E214900200012 ENDBIB 10 0 E214900200013 NOCOMMON 0 0 E214900200014 DATA 9 17 E214900200015 EN DATA ERR-T ERR-SYS ERR-S ERR-1 E214900200016 ERR-2 ERR-3 ERR-4 E214900200017 MEV/A MB MB MB MB MB E214900200018 MB MB MB E214900200019 33.6 1242. 22. 1.66 0.64 0.52 E214900200020 0.64 0.24 0.72 E214900200021 40.2 1192. 21. 1.69 0.51 0.27 E214900200022 1.53 0.24 0.42 E214900200023 47.2 1141. 25. 1.73 1.3 E214900200024 E214900200025 60.8 1043. 15. 1.25 0.71 0.27 E214900200026 1.15 0.19 0.29 E214900200027 76.2 987. 13. 1.2 0.44 0.1 E214900200028 1.17 0.17 0.09 E214900200029 84.4 956. 14. 1.15 0.82 E214900200030 E214900200031 98.4 928. 9. 0.92 0.29 0.04 E214900200032 0.89 0.11 0.15 E214900200033 118.4 878. 9. 0.68 0.69 E214900200034 E214900200035 121.1 871. 8. 0.84 0.31 0.03 E214900200036 0.41 0.26 0.09 E214900200037 139.8 828. 7. 0.68 0.48 E214900200038 E214900200039 158.2 785. 9. 0.68 1. E214900200040 E214900200041 195.5 754. 10. 1.26 0.45 0.04 E214900200042 0.84 0.48 E214900200043 224.6 747. 13. 1.42 0.95 0.04 E214900200044 1.14 0.28 0.5 E214900200045 250.8 740. 8. 1. 0.56 0.01 E214900200046 0.82 0.23 0.34 E214900200047 274.7 734. 11. 0.62 1.36 E214900200048 E214900200049 324.9 739. 12. 1.45 0.64 0.03 E214900200050 1.07 0.24 0.51 E214900200051 372.4 730. 13. 1.68 0.55 0.04 E214900200052 0.4 0.63 0.56 E214900200053 ENDDATA 38 0 E214900200054 ENDSUBENT 53 0 E214900299999 SUBENT E2149003 20100816 E063E214900300001 BIB 4 10 E214900300002 REACTION (6-C-12(6-C-12,NON),,SIG) E214900300003 PART-DET (6-C-12) E214900300004 ERR-ANALYS (ERR-T) Total uncertainty E214900300005 (ERR-SYS) Total systematic uncertainty E214900300006 (ERR-1) Uncertainty due to target thickness E214900300007 (ERR-2) Uncertainty due to inelastic scattering E214900300008 (ERR-3) Uncertainty due to 11C production E214900300009 (ERR-4) Uncertainty due to 10C and 13C production E214900300010 (ERR-S) Statistical uncertainty E214900300011 STATUS (TABLE) Plotted in Fig.1 of J,PR/C,79,061601,2009 E214900300012 ENDBIB 10 0 E214900300013 NOCOMMON 0 0 E214900300014 DATA 9 18 E214900300015 EN DATA ERR-T ERR-SYS ERR-S ERR-1 E214900300016 ERR-2 ERR-3 ERR-4 E214900300017 MEV/A MB MB MB MB MB E214900300018 MB MB MB E214900300019 32.5 1209. 32. 2.5 0.93 0.73 E214900300020 2.22 0.5 0.5 E214900300021 40.3 1159. 11. 0.79 0.59 0.29 E214900300022 0.57 0.3 0.23 E214900300023 46.1 1125. 15. 0.45 1.22 E214900300024 E214900300025 56.4 1076. 22. 2. 0.58 0.17 E214900300026 1.91 0.26 0.19 E214900300027 69.9 1039. 9. 0.76 0.39 0.09 E214900300028 0.69 0.18 0.18 E214900300029 76.4 1014. 12. 1.02 0.53 0.11 E214900300030 0.96 0.21 0.09 E214900300031 86.3 998. 13. 0.74 1.12 E214900300032 E214900300033 98.8 962. 10. 0.96 0.34 0.05 E214900300034 0.93 0.15 0.19 E214900300035 118.4 919. 11. 0.92 0.81 E214900300036 E214900300037 121.1 910. 5. 0.5 0.32 0.03 E214900300038 0.41 0.26 0.09 E214900300039 139.8 870. 5. 0.27 0.52 E214900300040 E214900300041 157.4 831. 9. 0.32 1.06 E214900300042 E214900300043 195.5 797. 13. 1.51 0.58 0.04 E214900300044 0.96 0.44 E214900300045 224.5 789. 11. 1.19 0.71 0.05 E214900300046 0.72 0.26 0.42 E214900300047 250.8 782. 9. 0.94 0.66 0.03 E214900300048 0.67 0.2 0.53 E214900300049 274.7 776. 12. 0.72 1.4 E214900300050 E214900300051 324.9 773. 11. 1.21 0.63 0.04 E214900300052 0.46 0.04 0.48 E214900300053 372.4 770. 14. 1.73 0.6 0.04 E214900300054 0.19 0.56 0.5 E214900300055 ENDDATA 40 0 E214900300056 ENDSUBENT 55 0 E214900399999 SUBENT E2149004 20100816 E063E214900400001 BIB 5 11 E214900400002 REACTION (13-AL-27(6-C-12,NON),,SIG) E214900400003 PART-DET (6-C-12) E214900400004 ERR-ANALYS (ERR-T) Total uncertainty E214900400005 (ERR-SYS) Total systematic uncertainty E214900400006 (ERR-1) Uncertainty due to target thickness E214900400007 (ERR-2) Uncertainty due to inelastic scattering E214900400008 (ERR-3) Uncertainty due to 11C production E214900400009 (ERR-4) Uncertainty due to 10C and 13C production E214900400010 (ERR-S) Statistical uncertainty E214900400011 STATUS (TABLE) Plotted in Fig.1 of J,PR/C,79,061601,2009 E214900400012 HISTORY (20100104A) Nf. Swap SF1 and SF2 E214900400013 ENDBIB 11 0 E214900400014 NOCOMMON 0 0 E214900400015 DATA 9 15 E214900400016 EN DATA ERR-T ERR-SYS ERR-S ERR-1 E214900400017 ERR-2 ERR-3 ERR-4 E214900400018 MEV/A MB MB MB MB MB E214900400019 MB MB MB E214900400020 40.2 1592. 24. 1.26 0.79 0.25 E214900400021 1.08 0.3 0.31 E214900400022 63.7 1453. 27. 1.63 0.92 0.23 E214900400023 1.44 0.48 0.25 E214900400024 76.7 1422. 12. 0.6 0.58 0.09 E214900400025 0.55 0.17 0.12 E214900400026 86.1 1401. 17. 0.14 1.2 E214900400027 E214900400028 99.2 1343. 16. 1.11 0.36 0.04 E214900400029 1.1 0.15 0.05 E214900400030 118.5 1279. 23. 1.57 0.86 E214900400031 E214900400032 122.0 1296. 10. 0.71 0.29 0.02 E214900400033 0.7 0.05 0.05 E214900400034 139.9 1250. 11. 0.76 0.48 E214900400035 E214900400036 158.2 1225. 12. 0.06 0.97 E214900400037 E214900400038 196.1 1172. 20. 1.62 0.52 0.03 E214900400039 0.57 0.44 E214900400040 224.5 1157. 18. 1.34 0.75 0.04 E214900400041 0.7 0.27 0.48 E214900400042 250.7 1159. 14. 1.12 0.53 0.02 E214900400043 0.92 0.19 0.3 E214900400044 274.7 1161. 17. 0.92 1.19 E214900400045 E214900400046 324.9 1152. 18. 1.45 0.66 0.03 E214900400047 0.27 0.21 0.47 E214900400048 372.4 1150. 19. 1.54 0.62 0.03 E214900400049 1.34 0.04 0.48 E214900400050 ENDDATA 34 0 E214900400051 ENDSUBENT 50 0 E214900499999 SUBENT E2149005 20100816 E063E214900500001 BIB 5 13 E214900500002 REACTION (4-BE-9(4-BE-11,NON),,SIG) E214900500003 PART-DET (4-BE-11) E214900500004 FACILITY (PRJFS,2JPNIRS) To separate fragment from Be E214900500005 production target bombarded by 13C E214900500006 primary beam E214900500007 ERR-ANALYS (ERR-T) Total uncertainty E214900500008 (ERR-SYS) Total systematic uncertainty E214900500009 (ERR-1) Uncertainty due to target thickness E214900500010 (ERR-2) Uncertainty due to inelastic scattering E214900500011 (ERR-3) Uncertainty due to 11C production E214900500012 (ERR-4) Uncertainty due to 10C and 13C production E214900500013 (ERR-S) Statistical uncertainty E214900500014 STATUS (TABLE) Plotted in Fig.3 of J,PR/C,79,061601,2009 E214900500015 ENDBIB 13 0 E214900500016 NOCOMMON 0 0 E214900500017 DATA 9 3 E214900500018 EN DATA ERR-T ERR-SYS ERR-S ERR-1 E214900500019 ERR-2 ERR-3 ERR-4 E214900500020 MEV/A MB MB MB MB MB E214900500021 MB MB MB E214900500022 78.2 1107. 19. 1.46 0.91 0.05 E214900500023 0.71 1.18 0.36 E214900500024 98.2 1013. 13. 1.12 0.66 0.02 E214900500025 0.5 0.98 0.17 E214900500026 118.1 924. 18. 0.73 1.75 E214900500027 E214900500028 ENDDATA 10 0 E214900500029 ENDSUBENT 28 0 E214900599999 SUBENT E2149006 20100816 E063E214900600001 BIB 4 4 E214900600002 REACTION (4-BE-9(6-C-12,INL)4-BE-9,,SIG) E214900600003 PART-DET (6-C-12) E214900600004 ERR-ANALYS (DATA-ERR) No information on source of uncertainties E214900600005 STATUS (TABLE) Table 4-7 of T,TAKECHI,2005 E214900600006 ENDBIB 4 0 E214900600007 NOCOMMON 0 0 E214900600008 DATA 3 1 E214900600009 EN DATA DATA-ERR E214900600010 MEV/A MB MB E214900600011 122.0 52. 4. E214900600012 ENDDATA 3 0 E214900600013 ENDSUBENT 12 0 E214900699999 SUBENT E2149007 20100816 E063E214900700001 BIB 5 6 E214900700002 REACTION (6-C-12(6-C-12,INL)6-C-12,,SIG) E214900700003 PART-DET (6-C-12) E214900700004 ERR-ANALYS (DATA-ERR) No information on source of uncertainties E214900700005 STATUS (TABLE) Table 4-7 of T,TAKECHI,2005 E214900700006 HISTORY (20100604A) Tsubakihara. STATUS: reference information E214900700007 added E214900700008 ENDBIB 6 0 E214900700009 NOCOMMON 0 0 E214900700010 DATA 3 1 E214900700011 EN DATA DATA-ERR E214900700012 MEV/A MB MB E214900700013 121.1 43. 3. E214900700014 ENDDATA 3 0 E214900700015 ENDSUBENT 14 0 E214900799999 SUBENT E2149008 20100816 E063E214900800001 BIB 5 6 E214900800002 REACTION (13-AL-27(6-C-12,INL)13-AL-27,,SIG) E214900800003 PART-DET (6-C-12) E214900800004 ERR-ANALYS (DATA-ERR) No information on source of uncertainties E214900800005 STATUS (TABLE) Table 4-7 of T,TAKECHI,2005 E214900800006 HISTORY (20100604A) Tsubakihara. STATUS: reference information E214900800007 added E214900800008 ENDBIB 6 0 E214900800009 NOCOMMON 0 0 E214900800010 DATA 3 1 E214900800011 EN DATA DATA-ERR E214900800012 MEV/A MB MB E214900800013 122.0 75. 7. E214900800014 ENDDATA 3 0 E214900800015 ENDSUBENT 14 0 E214900899999 SUBENT E2149009 20100816 E063E214900900001 BIB 5 6 E214900900002 REACTION (4-BE-9(6-C-12,X)6-C-11,,SIG) E214900900003 PART-DET (6-C-11) E214900900004 ERR-ANALYS (DATA-ERR) No information on source of uncertainties E214900900005 STATUS (TABLE) Table 4-7 of T,TAKECHI,2005 E214900900006 HISTORY (20100604A) Tsubakihara. STATUS: reference information E214900900007 added E214900900008 ENDBIB 6 0 E214900900009 NOCOMMON 0 0 E214900900010 DATA 3 1 E214900900011 EN DATA DATA-ERR E214900900012 MEV/A MB MB E214900900013 122.0 27. 3. E214900900014 ENDDATA 3 0 E214900900015 ENDSUBENT 14 0 E214900999999 SUBENT E2149010 20100816 E063E214901000001 BIB 5 6 E214901000002 REACTION (4-BE-9(6-C-12,X)6-C-10,,SIG) E214901000003 PART-DET (6-C-10) E214901000004 ERR-ANALYS (DATA-ERR) No information on source of uncertainties E214901000005 STATUS (TABLE) Table 4-7 of T,TAKECHI,2005 E214901000006 HISTORY (20100604A) Tsubakihara. STATUS: reference information E214901000007 added E214901000008 ENDBIB 6 0 E214901000009 NOCOMMON 0 0 E214901000010 DATA 3 1 E214901000011 EN DATA DATA-ERR E214901000012 MEV/A MB MB E214901000013 122.0 3. 1. E214901000014 ENDDATA 3 0 E214901000015 ENDSUBENT 14 0 E214901099999 SUBENT E2149011 20100816 E063E214901100001 BIB 5 6 E214901100002 REACTION (4-BE-9(6-C-12,X)6-C-13,,SIG) E214901100003 PART-DET (6-C-13) E214901100004 ERR-ANALYS (DATA-ERR) No information on source of uncertainties E214901100005 STATUS (TABLE) Table 4-7 of T,TAKECHI,2005 E214901100006 HISTORY (20100604A) Tsubakihara. STATUS: reference information E214901100007 added E214901100008 ENDBIB 6 0 E214901100009 NOCOMMON 0 0 E214901100010 DATA 3 1 E214901100011 EN DATA DATA-ERR E214901100012 MEV/A MB MB E214901100013 122.0 5. 1. E214901100014 ENDDATA 3 0 E214901100015 ENDSUBENT 14 0 E214901199999 SUBENT E2149012 20100816 E063E214901200001 BIB 5 6 E214901200002 REACTION (6-C-12(6-C-12,X)6-C-11,,SIG) E214901200003 PART-DET (6-C-11) E214901200004 ERR-ANALYS (DATA-ERR) No information on source of uncertainties E214901200005 STATUS (TABLE) Table 4-7 of T,TAKECHI,2005 E214901200006 HISTORY (20100604A) Tsubakihara. STATUS: reference information E214901200007 added E214901200008 ENDBIB 6 0 E214901200009 NOCOMMON 0 0 E214901200010 DATA 3 1 E214901200011 EN DATA DATA-ERR E214901200012 MEV/A MB MB E214901200013 121.1 28. 3. E214901200014 ENDDATA 3 0 E214901200015 ENDSUBENT 14 0 E214901299999 SUBENT E2149013 20100816 E063E214901300001 BIB 5 6 E214901300002 REACTION (6-C-12(6-C-12,X)6-C-10,,SIG) E214901300003 PART-DET (6-C-10) E214901300004 ERR-ANALYS (DATA-ERR) No information on source of uncertainties E214901300005 STATUS (TABLE) Table 4-7 of T,TAKECHI,2005 E214901300006 HISTORY (20100604A) Tsubakihara. STATUS: reference information E214901300007 added E214901300008 ENDBIB 6 0 E214901300009 NOCOMMON 0 0 E214901300010 DATA 3 1 E214901300011 EN DATA DATA-ERR E214901300012 MEV/A MB MB E214901300013 121.1 3. 1. E214901300014 ENDDATA 3 0 E214901300015 ENDSUBENT 14 0 E214901399999 SUBENT E2149014 20100816 E063E214901400001 BIB 5 6 E214901400002 REACTION (6-C-12(6-C-12,X)6-C-13,,SIG) E214901400003 PART-DET (6-C-13) E214901400004 ERR-ANALYS (DATA-ERR) No information on source of uncertainties E214901400005 STATUS (TABLE) Table 4-7 of T,TAKECHI,2005 E214901400006 HISTORY (20100604A) Tsubakihara. STATUS: reference information E214901400007 added E214901400008 ENDBIB 6 0 E214901400009 NOCOMMON 0 0 E214901400010 DATA 3 1 E214901400011 EN DATA DATA-ERR E214901400012 MEV/A MB MB E214901400013 121.1 6. 1. E214901400014 ENDDATA 3 0 E214901400015 ENDSUBENT 14 0 E214901499999 SUBENT E2149015 20100816 E063E214901500001 BIB 5 6 E214901500002 REACTION (13-AL-27(6-C-12,X)6-C-11,,SIG) E214901500003 PART-DET (6-C-11) E214901500004 ERR-ANALYS (DATA-ERR) No information on source of uncertainties E214901500005 STATUS (TABLE) Table 4-7 of T,TAKECHI,2005 E214901500006 HISTORY (20100604A) Tsubakihara. STATUS: reference information E214901500007 added E214901500008 ENDBIB 6 0 E214901500009 NOCOMMON 0 0 E214901500010 DATA 3 1 E214901500011 EN DATA DATA-ERR E214901500012 MEV/A MB MB E214901500013 122.0 44. 1. E214901500014 ENDDATA 3 0 E214901500015 ENDSUBENT 14 0 E214901599999 SUBENT E2149016 20100816 E063E214901600001 BIB 5 6 E214901600002 REACTION (13-AL-27(6-C-12,X)6-C-10,,SIG) E214901600003 PART-DET (6-C-10) E214901600004 ERR-ANALYS (DATA-ERR) No information on source of uncertainties E214901600005 STATUS (TABLE) Table 4-7 of T,TAKECHI,2005 E214901600006 HISTORY (20100604A) Tsubakihara. STATUS: reference information E214901600007 added E214901600008 ENDBIB 6 0 E214901600009 NOCOMMON 0 0 E214901600010 DATA 3 1 E214901600011 EN DATA DATA-ERR E214901600012 MEV/A MB MB E214901600013 122.0 4. 1. E214901600014 ENDDATA 3 0 E214901600015 ENDSUBENT 14 0 E214901699999 SUBENT E2149017 20100816 E063E214901700001 BIB 5 6 E214901700002 REACTION (13-AL-27(6-C-12,X)6-C-13,,SIG) E214901700003 PART-DET (6-C-13) E214901700004 ERR-ANALYS (DATA-ERR) No information on source of uncertainties E214901700005 STATUS (TABLE) Table 4-7 of T,TAKECHI,2005 E214901700006 HISTORY (20100604A) Tsubakihara. STATUS: reference information E214901700007 added E214901700008 ENDBIB 6 0 E214901700009 NOCOMMON 0 0 E214901700010 DATA 3 1 E214901700011 EN DATA DATA-ERR E214901700012 MEV/A MB MB E214901700013 122.0 9. 1. E214901700014 ENDDATA 3 0 E214901700015 ENDSUBENT 14 0 E214901799999 ENDENTRY 17 0 E214999999999