ENTRY E2409 20130906 E077E240900000001 SUBENT E2409001 20130906 E077E240900100001 BIB 13 52 E240900100002 TITLE Analysis of fragmentation excitation functions of lead E240900100003 by carbon ions up to 400 MeV/u E240900100004 AUTHOR (T.Ogawa, M.N.Morev, T.Sato, S.Hashimoto) E240900100005 INSTITUTE (2JPNJAE) Nuclear Science and Engineering Directorate E240900100006 (4RUSRUS) Laboratory of Radioactive Wastes, Science E240900100007 and Engineering Center for Nuclear and E240900100008 Radiation Safety, Moscow E240900100009 REFERENCE (J,NIM/B,300,35,2013) E240900100010 INC-SOURCE Beam intensity is 6.67E+07 PPS. E240900100011 SAMPLE - Target is natural. E240900100012 - Chemical-form of target is element. Chemical purity E240900100013 is higher than 99.99% E240900100014 - Physical-form of target is solid. E240900100015 - Target-thickness: Target assembled by 55 circular E240900100016 lead plates of 0.1 cm thickness and of 2.0 cm E240900100017 diameter was placed 15.5 cm downstream the beam E240900100018 window. E240900100019 METHOD (STTA,GSPEC,ACTIV) E240900100020 FACILITY (SYNCH,2JPNIRS) Heavy Ion Medical Accelerator in Chiba E240900100021 (HIMAC) E240900100022 DETECTOR (IOCH) An air-filled plane parallel ionization chamber E240900100023 with thickness 1.405e-02 g/cm2 including 4.0 mm E240900100024 of sensitive layer was placed immediately E240900100025 downstream the beam window to monitor the beam E240900100026 intensity integrated over the beam time. E240900100027 (HPGE) Gamma-ray spectra of the irradiated samples E240900100028 were measured with an high purity Ge detector E240900100029 coupled to a spectroscopy-amplifier and a E240900100030 multichannel analyzer. E240900100031 ERR-ANALYS - Systematic uncertainty attributed to beam intensity E240900100032 measurement with the ionization chamber: stopping E240900100033 power of primary ions in air 2.8%, air temperature E240900100034 and air pressure < equal to 1.0%, recombination E240900100035 correction 1.3%, ionization chamber sensitive volume E240900100036 0.13%, W value 1.5%, ionization current 0.03%, the E240900100037 total uncertainty is 3.6% E240900100038 - Systematic uncertainty attributed to HPGe detection E240900100039 efficiency calibration: calibrated source (60CO) E240900100040 activity 1.9%, gamma-ray full absorption peak area E240900100041 0.48%, cascade coincidence loss correction 2.33%, E240900100042 efficiency fitting by gamma-ray energy 0-12% and the E240900100043 total uncertainty is 3.1-12% E240900100044 (ERR-1,7.,24.) Secondary particle contribution E240900100045 correction (7-24%) E240900100046 (ERR-2,0.,5.5) Primary ion beam intensity at various E240900100047 target depths were determined based on E240900100048 10% uncertainty of the total E240900100049 cross-section of target nuclei (0-5.5%) E240900100050 ADD-RES (COMP) Quantum molecular dynamics (QMD) E240900100051 STATUS (APRVD) Dr. T. Ogawa E240900100052 HISTORY (20130413C) V.D and A. Makinaga E240900100053 (20130521R) Received by e-mail from T. Ogawa E240900100054 ENDBIB 52 0 E240900100055 NOCOMMON 0 0 E240900100056 ENDSUBENT 55 0 E240900199999 SUBENT E2409002 20130906 E077E240900200001 BIB 4 5 E240900200002 REACTION (82-PB-0(6-C-12,X)11-NA-24,CUM,SIG) E240900200003 DECAY-DATA (11-NA-24,0.6249D,DG,1369.,, E240900200004 DG,2754.) E240900200005 ERR-ANALYS (ERR-T) Total uncertainty E240900200006 STATUS (TABLE) Plotted in Fig.7 (a) of NIM/B, 300 (2013) 35 E240900200007 ENDBIB 5 0 E240900200008 NOCOMMON 0 0 E240900200009 DATA 4 20 E240900200010 EN EN-ERR DATA ERR-T E240900200011 MEV/A MEV/A MB MB E240900200012 20.170 19.577 15.660 1.258 E240900200013 50.515 10.767 24.732 2.001 E240900200014 83.563 6.820 27.028 2.031 E240900200015 108.770 6.174 25.748 1.903 E240900200016 130.505 4.992 26.739 1.797 E240900200017 150.501 4.522 29.474 1.883 E240900200018 168.408 4.657 35.456 1.956 E240900200019 185.249 3.984 35.715 1.894 E240900200020 201.136 4.154 33.446 1.711 E240900200021 216.311 3.628 35.955 1.761 E240900200022 231.247 3.486 37.244 1.698 E240900200023 273.107 3.169 41.590 1.559 E240900200024 285.930 3.404 43.297 1.523 E240900200025 298.481 3.028 44.961 1.491 E240900200026 310.773 3.267 44.859 1.403 E240900200027 323.129 3.201 44.849 1.280 E240900200028 358.485 2.813 44.168 0.962 E240900200029 369.613 2.837 45.928 0.921 E240900200030 380.811 2.737 45.390 0.838 E240900200031 391.820 2.762 46.059 0.799 E240900200032 ENDDATA 22 0 E240900200033 ENDSUBENT 32 0 E240900299999 SUBENT E2409003 20130906 E077E240900300001 BIB 4 5 E240900300002 REACTION (82-PB-0(6-C-12,X)12-MG-28,CUM,SIG) E240900300003 DECAY-DATA (12-MG-28,0.8715D,DG,1342.,, E240900300004 DG,1778.) E240900300005 ERR-ANALYS (ERR-T) Total uncertainty E240900300006 STATUS (TABLE) Plotted in Fig.7(b) of NIM/B, 300 (2013) 35 E240900300007 ENDBIB 5 0 E240900300008 NOCOMMON 0 0 E240900300009 DATA 4 22 E240900300010 EN EN-ERR DATA ERR-T E240900300011 MEV/A MEV/A MB MB E240900300012 20.170 19.577 3.223 0.421 E240900300013 69.012 7.730 2.651 0.390 E240900300014 96.490 6.106 6.165 0.591 E240900300015 120.229 5.285 2.356 0.343 E240900300016 140.738 5.242 9.534 0.695 E240900300017 159.387 4.365 8.022 0.667 E240900300018 177.165 4.101 8.301 0.535 E240900300019 193.108 3.875 6.860 0.551 E240900300020 208.986 3.697 11.236 0.629 E240900300021 223.850 3.911 7.571 0.562 E240900300022 238.159 3.426 9.543 0.520 E240900300023 266.390 3.549 8.708 0.441 E240900300024 279.401 3.126 10.356 0.584 E240900300025 292.393 3.060 8.182 0.406 E240900300026 304.507 2.999 9.388 0.522 E240900300027 316.984 2.944 8.872 0.401 E240900300028 329.202 2.873 8.920 0.430 E240900300029 352.753 2.920 8.613 0.382 E240900300030 364.037 2.740 8.297 0.288 E240900300031 375.262 2.812 9.391 0.367 E240900300032 386.303 2.755 9.688 0.278 E240900300033 397.291 2.709 9.102 0.335 E240900300034 ENDDATA 24 0 E240900300035 ENDSUBENT 34 0 E240900399999 SUBENT E2409004 20130906 E077E240900400001 BIB 4 4 E240900400002 REACTION (82-PB-0(6-C-12,X)19-K-43,CUM,SIG) E240900400003 DECAY-DATA (19-K-43,0.9292D,DG,617.) E240900400004 ERR-ANALYS (ERR-T) Total uncertainty E240900400005 STATUS (TABLE) Plotted in Fig.7(c) of NIM/B, 300 (2013) 35 E240900400006 ENDBIB 4 0 E240900400007 NOCOMMON 0 0 E240900400008 DATA 4 22 E240900400009 EN EN-ERR DATA ERR-T E240900400010 MEV/A MEV/A MB MB E240900400011 20.170 19.577 15.055 0.934 E240900400012 69.012 7.730 6.379 0.447 E240900400013 96.490 6.106 4.415 0.320 E240900400014 120.229 5.285 5.701 0.380 E240900400015 140.738 5.242 6.222 0.369 E240900400016 159.387 4.365 4.040 0.278 E240900400017 177.165 4.101 5.322 0.282 E240900400018 193.108 3.875 5.087 0.296 E240900400019 208.986 3.697 5.222 0.261 E240900400020 223.850 3.911 4.878 0.271 E240900400021 238.159 3.426 6.516 0.281 E240900400022 266.390 3.549 7.215 0.269 E240900400023 279.401 3.126 7.064 0.291 E240900400024 292.393 3.060 6.688 0.235 E240900400025 304.507 2.999 7.949 0.290 E240900400026 316.984 2.944 7.764 0.236 E240900400027 329.202 2.873 7.305 0.230 E240900400028 352.753 2.920 9.025 0.229 E240900400029 364.037 2.740 7.574 0.164 E240900400030 375.262 2.812 8.066 0.192 E240900400031 386.303 2.755 7.257 0.139 E240900400032 397.291 2.709 7.107 0.165 E240900400033 ENDDATA 24 0 E240900400034 ENDSUBENT 33 0 E240900499999 SUBENT E2409005 20130906 E077E240900500001 BIB 4 5 E240900500002 REACTION (82-PB-0(6-C-12,X)21-SC-46,,SIG) E240900500003 DECAY-DATA (21-SC-46-G,83.79D,DG,889.3,, E240900500004 DG,1120.) E240900500005 ERR-ANALYS (ERR-T) Total uncertainty E240900500006 STATUS (TABLE) Plotted in Fig.7(d) of NIM/B, 300 (2013) 35 E240900500007 ENDBIB 5 0 E240900500008 NOCOMMON 0 0 E240900500009 DATA 4 31 E240900500010 EN EN-ERR DATA ERR-T E240900500011 MEV/A MEV/A MB MB E240900500012 20.170 19.577 0.919 0.081 E240900500013 50.515 10.767 2.000 0.134 E240900500014 69.012 7.730 2.330 0.142 E240900500015 83.563 6.820 2.730 0.162 E240900500016 96.490 6.106 2.700 0.130 E240900500017 108.770 6.174 2.790 0.151 E240900500018 120.229 5.285 3.530 0.189 E240900500019 130.505 4.992 3.280 0.184 E240900500020 140.738 5.242 4.340 0.276 E240900500021 159.387 4.365 4.090 0.201 E240900500022 168.408 4.657 4.400 0.189 E240900500023 185.249 3.984 4.810 0.223 E240900500024 201.136 4.154 5.360 0.180 E240900500025 216.311 3.628 6.060 0.233 E240900500026 231.247 3.486 6.020 0.177 E240900500027 245.292 3.707 6.490 0.222 E240900500028 259.240 3.602 7.060 0.236 E240900500029 273.107 3.169 7.250 0.268 E240900500030 285.930 3.404 7.350 0.218 E240900500031 298.481 3.028 7.720 0.246 E240900500032 310.773 3.267 7.970 0.202 E240900500033 323.129 3.201 7.840 0.222 E240900500034 335.221 3.147 10.000 0.247 E240900500035 346.940 2.894 9.120 0.218 E240900500036 358.485 2.813 9.560 0.237 E240900500037 364.037 2.740 7.050 0.149 E240900500038 369.613 2.837 9.690 0.202 E240900500039 375.262 2.812 9.150 0.207 E240900500040 380.811 2.737 9.950 0.205 E240900500041 391.820 2.762 11.600 0.197 E240900500042 397.291 2.709 10.500 0.177 E240900500043 ENDDATA 33 0 E240900500044 ENDSUBENT 43 0 E240900599999 SUBENT E2409006 20130906 E077E240900600001 BIB 4 4 E240900600002 REACTION (82-PB-0(6-C-12,X)23-V-48,CUM,SIG) E240900600003 DECAY-DATA (23-V-48,15.97D,DG,983.5) E240900600004 ERR-ANALYS (ERR-T) Total uncertainty E240900600005 STATUS (TABLE) Plotted in Fig.7(e) of NIM/B, 300 (2013) 35 E240900600006 ENDBIB 4 0 E240900600007 NOCOMMON 0 0 E240900600008 DATA 4 15 E240900600009 EN EN-ERR DATA ERR-T E240900600010 MEV/A MEV/A MB MB E240900600011 69.012 7.730 0.754 0.066 E240900600012 108.770 6.174 0.633 0.066 E240900600013 140.738 5.242 0.720 0.064 E240900600014 168.408 4.657 0.886 0.068 E240900600015 193.108 3.875 0.831 0.066 E240900600016 216.311 3.628 1.247 0.078 E240900600017 238.159 3.426 1.417 0.087 E240900600018 259.240 3.602 1.133 0.068 E240900600019 279.401 3.126 1.305 0.080 E240900600020 298.481 3.028 1.621 0.088 E240900600021 316.984 2.944 2.075 0.097 E240900600022 335.221 3.147 1.797 0.089 E240900600023 352.753 2.920 1.907 0.089 E240900600024 369.613 2.837 1.970 0.091 E240900600025 386.303 2.755 1.938 0.080 E240900600026 ENDDATA 17 0 E240900600027 ENDSUBENT 26 0 E240900699999 SUBENT E2409007 20130906 E077E240900700001 BIB 4 4 E240900700002 REACTION (82-PB-0(6-C-12,X)25-MN-54,,SIG) E240900700003 DECAY-DATA (25-MN-54,312.1D,DG,834.8) E240900700004 ERR-ANALYS (ERR-T) Total uncertainty E240900700005 STATUS (TABLE) Plotted in Fig.7(f) of NIM/B, 300 (2013) 35 E240900700006 ENDBIB 4 0 E240900700007 NOCOMMON 0 0 E240900700008 DATA 4 32 E240900700009 EN EN-ERR DATA ERR-T E240900700010 MEV/A MEV/A MB MB E240900700011 20.170 19.577 1.390 0.238 E240900700012 50.515 10.767 2.610 0.400 E240900700013 69.012 7.730 2.670 0.403 E240900700014 83.563 6.820 2.780 0.417 E240900700015 96.490 6.106 3.380 0.470 E240900700016 108.770 6.174 3.260 0.455 E240900700017 120.229 5.285 2.910 0.414 E240900700018 130.505 4.992 3.200 0.440 E240900700019 140.738 5.242 2.950 0.431 E240900700020 150.501 4.522 3.320 0.432 E240900700021 159.387 4.365 3.580 0.457 E240900700022 168.408 4.657 3.920 0.479 E240900700023 185.249 3.984 4.250 0.497 E240900700024 201.136 4.154 4.560 0.481 E240900700025 216.311 3.628 5.110 0.527 E240900700026 231.247 3.486 5.620 0.519 E240900700027 245.292 3.707 5.760 0.523 E240900700028 259.240 3.602 5.660 0.485 E240900700029 273.107 3.169 6.160 0.508 E240900700030 285.930 3.404 6.780 0.492 E240900700031 298.481 3.028 7.580 0.514 E240900700032 310.773 3.267 6.940 0.415 E240900700033 323.129 3.201 6.620 0.377 E240900700034 335.221 3.147 8.280 0.409 E240900700035 346.940 2.894 7.510 0.333 E240900700036 358.485 2.813 8.620 0.344 E240900700037 364.037 2.740 5.820 0.210 E240900700038 369.613 2.837 8.130 0.277 E240900700039 375.262 2.812 7.670 0.256 E240900700040 380.811 2.737 8.320 0.257 E240900700041 391.820 2.762 9.270 0.221 E240900700042 397.291 2.709 8.360 0.195 E240900700043 ENDDATA 34 0 E240900700044 ENDSUBENT 43 0 E240900799999 SUBENT E2409008 20130906 E077E240900800001 BIB 4 5 E240900800002 REACTION (82-PB-0(6-C-12,X)27-CO-56,CUM,SIG) E240900800003 DECAY-DATA (27-CO-56,77.24D,DG,846.8,, E240900800004 DG,1238.3) E240900800005 ERR-ANALYS (ERR-T) Total uncertainty E240900800006 STATUS (TABLE) Plotted in Fig.8(a) of NIM/B, 300 (2013) 35 E240900800007 ENDBIB 5 0 E240900800008 NOCOMMON 0 0 E240900800009 DATA 4 31 E240900800010 EN EN-ERR DATA ERR-T E240900800011 MEV/A MEV/A MB MB E240900800012 20.170 19.577 0.065 E240900800013 50.515 10.767 0.261 0.158 E240900800014 69.012 7.730 0.253 0.152 E240900800015 83.563 6.820 0.095 E240900800016 96.490 6.106 0.164 E240900800017 108.770 6.174 0.347 0.141 E240900800018 120.229 5.285 0.324 E240900800019 130.505 4.992 0.250 0.066 E240900800020 140.738 5.242 0.175 E240900800021 159.387 4.365 0.356 0.109 E240900800022 168.408 4.657 0.281 0.117 E240900800023 185.249 3.984 0.303 0.092 E240900800024 201.136 4.154 0.240 0.106 E240900800025 216.311 3.628 0.287 E240900800026 231.247 3.486 0.276 0.049 E240900800027 245.292 3.707 0.310 0.080 E240900800028 259.240 3.602 0.510 0.141 E240900800029 273.107 3.169 0.555 0.120 E240900800030 285.930 3.404 0.533 0.177 E240900800031 298.481 3.028 0.292 0.043 E240900800032 310.773 3.267 0.488 0.098 E240900800033 323.129 3.201 0.791 0.090 E240900800034 335.221 3.147 0.634 0.089 E240900800035 346.940 2.894 0.576 0.075 E240900800036 358.485 2.813 0.876 0.119 E240900800037 364.037 2.740 0.547 0.066 E240900800038 369.613 2.837 0.752 0.086 E240900800039 375.262 2.812 0.781 0.071 E240900800040 380.811 2.737 0.919 0.088 E240900800041 391.820 2.762 0.865 0.065 E240900800042 397.291 2.709 0.737 0.057 E240900800043 ENDDATA 33 0 E240900800044 ENDSUBENT 43 0 E240900899999 SUBENT E2409009 20130906 E077E240900900001 BIB 4 5 E240900900002 REACTION (82-PB-0(6-C-12,X)26-FE-59,CUM,SIG) E240900900003 DECAY-DATA (26-FE-59,44.495D,DG,1097.,, E240900900004 DG,1291.) E240900900005 ERR-ANALYS (ERR-T) Total uncertainty E240900900006 STATUS (TABLE) Plotted in Fig.8(b) of NIM/B, 300 (2013) 35 E240900900007 ENDBIB 5 0 E240900900008 NOCOMMON 0 0 E240900900009 DATA 4 32 E240900900010 EN EN-ERR DATA ERR-T E240900900011 MEV/A MEV/A MB MB E240900900012 20.170 19.577 4.380 0.704 E240900900013 50.515 10.767 4.650 0.697 E240900900014 69.012 7.730 4.820 0.694 E240900900015 83.563 6.820 3.310 0.474 E240900900016 96.490 6.106 3.440 0.484 E240900900017 108.770 6.174 3.220 0.452 E240900900018 120.229 5.285 3.120 0.416 E240900900019 130.505 4.992 2.930 0.426 E240900900020 140.738 5.242 2.120 0.427 E240900900021 150.501 4.522 2.410 E240900900022 159.387 4.365 2.590 0.448 E240900900023 168.408 4.657 2.610 0.382 E240900900024 185.249 3.984 3.590 0.397 E240900900025 201.136 4.154 3.840 0.413 E240900900026 216.311 3.628 3.040 0.410 E240900900027 231.247 3.486 2.820 0.262 E240900900028 245.292 3.707 3.090 0.234 E240900900029 259.240 3.602 3.550 0.417 E240900900030 273.107 3.169 2.870 0.368 E240900900031 285.930 3.404 3.690 0.408 E240900900032 298.481 3.028 3.300 0.348 E240900900033 310.773 3.267 2.880 0.259 E240900900034 323.129 3.201 3.330 0.358 E240900900035 335.221 3.147 4.820 0.421 E240900900036 346.940 2.894 4.420 0.369 E240900900037 358.485 2.813 4.080 0.347 E240900900038 364.037 2.740 2.730 0.212 E240900900039 369.613 2.837 3.710 0.284 E240900900040 375.262 2.812 5.240 0.353 E240900900041 380.811 2.737 3.960 0.281 E240900900042 391.820 2.762 4.820 0.248 E240900900043 397.291 2.709 4.370 0.224 E240900900044 ENDDATA 34 0 E240900900045 ENDSUBENT 44 0 E240900999999 SUBENT E2409010 20130906 E077E240901000001 BIB 4 5 E240901000002 REACTION (82-PB-0(6-C-12,X)27-CO-60,IND,SIG) E240901000003 DECAY-DATA (27-CO-60-G,1925.D,DG,1172.,, E240901000004 DG,1332.) E240901000005 ERR-ANALYS (ERR-T) Total uncertainty E240901000006 STATUS (TABLE) Plotted in Fig.8(c) of NIM/B, 300 (2013) 35 E240901000007 ENDBIB 5 0 E240901000008 NOCOMMON 0 0 E240901000009 DATA 4 31 E240901000010 EN EN-ERR DATA ERR-T E240901000011 MEV/A MEV/A MB MB E240901000012 20.170 19.577 0.700 0.291 E240901000013 50.515 10.767 4.180 0.893 E240901000014 69.012 7.730 4.320 0.930 E240901000015 83.563 6.820 5.030 1.080 E240901000016 96.490 6.106 5.590 1.090 E240901000017 108.770 6.174 3.800 0.800 E240901000018 120.229 5.285 5.030 1.080 E240901000019 130.505 4.992 4.280 0.933 E240901000020 140.738 5.242 6.370 1.370 E240901000021 159.387 4.365 2.490 0.606 E240901000022 168.408 4.657 4.420 0.886 E240901000023 185.249 3.984 4.550 0.925 E240901000024 201.136 4.154 5.640 0.988 E240901000025 216.311 3.628 3.710 0.760 E240901000026 231.247 3.486 4.210 0.723 E240901000027 245.292 3.707 4.950 0.931 E240901000028 259.240 3.602 5.010 0.923 E240901000029 273.107 3.169 6.250 1.150 E240901000030 285.930 3.404 5.440 0.956 E240901000031 298.481 3.028 6.840 1.170 E240901000032 310.773 3.267 5.660 0.920 E240901000033 323.129 3.201 6.010 0.986 E240901000034 335.221 3.147 6.490 1.030 E240901000035 346.940 2.894 5.940 0.930 E240901000036 358.485 2.813 6.980 1.070 E240901000037 364.037 2.740 5.130 0.734 E240901000038 369.613 2.837 7.230 1.030 E240901000039 375.262 2.812 5.640 0.861 E240901000040 380.811 2.737 6.350 0.936 E240901000041 391.820 2.762 7.330 0.961 E240901000042 397.291 2.709 6.640 0.869 E240901000043 ENDDATA 33 0 E240901000044 ENDSUBENT 43 0 E240901099999 SUBENT E2409011 20130906 E077E240901100001 BIB 4 4 E240901100002 REACTION (82-PB-0(6-C-12,X)30-ZN-65,CUM,SIG) E240901100003 DECAY-DATA (30-ZN-65,243.93D,DG,1116.) E240901100004 ERR-ANALYS (ERR-T) Total uncertainty E240901100005 STATUS (TABLE) Plotted in Fig.8(d) of NIM/B, 300 (2013) 35 E240901100006 ENDBIB 4 0 E240901100007 NOCOMMON 0 0 E240901100008 DATA 4 31 E240901100009 EN EN-ERR DATA ERR-T E240901100010 MEV/A MEV/A MB MB E240901100011 20.170 19.577 2.270 0.302 E240901100012 50.515 10.767 3.980 0.413 E240901100013 69.012 7.730 4.360 0.442 E240901100014 83.563 6.820 4.140 0.439 E240901100015 96.490 6.106 4.040 0.356 E240901100016 108.770 6.174 4.160 0.395 E240901100017 120.229 5.285 3.940 0.418 E240901100018 130.505 4.992 3.920 0.401 E240901100019 140.738 5.242 4.260 0.512 E240901100020 159.387 4.365 4.330 0.412 E240901100021 168.408 4.657 4.970 0.429 E240901100022 185.249 3.984 3.870 0.357 E240901100023 201.136 4.154 4.630 0.318 E240901100024 216.311 3.628 5.890 0.440 E240901100025 231.247 3.486 5.010 0.303 E240901100026 245.292 3.707 4.380 0.332 E240901100027 259.240 3.602 5.850 0.406 E240901100028 273.107 3.169 5.730 0.435 E240901100029 285.930 3.404 6.010 0.379 E240901100030 298.481 3.028 5.720 0.387 E240901100031 310.773 3.267 6.550 0.352 E240901100032 323.129 3.201 6.480 0.374 E240901100033 335.221 3.147 8.150 0.413 E240901100034 346.940 2.894 7.400 0.364 E240901100035 358.485 2.813 7.420 0.381 E240901100036 364.037 2.740 5.280 0.244 E240901100037 369.613 2.837 7.360 0.337 E240901100038 375.262 2.812 7.420 0.339 E240901100039 380.811 2.737 6.950 0.325 E240901100040 391.820 2.762 7.910 0.296 E240901100041 397.291 2.709 7.140 0.267 E240901100042 ENDDATA 33 0 E240901100043 ENDSUBENT 42 0 E240901199999 SUBENT E2409012 20130906 E077E240901200001 BIB 4 4 E240901200002 REACTION (82-PB-0(6-C-12,X)33-AS-74,,SIG) E240901200003 DECAY-DATA (33-AS-74,17.77D,DG,595.) E240901200004 ERR-ANALYS (ERR-T) Total uncertainty E240901200005 STATUS (TABLE) Plotted in Fig.8(e) of NIM/B, 300 (2013) 35 E240901200006 ENDBIB 4 0 E240901200007 NOCOMMON 0 0 E240901200008 DATA 4 15 E240901200009 EN EN-ERR DATA ERR-T E240901200010 MEV/A MEV/A MB MB E240901200011 69.012 7.730 8.270 0.591 E240901200012 108.770 6.174 7.443 0.507 E240901200013 140.738 5.242 5.748 0.370 E240901200014 168.408 4.657 5.591 0.336 E240901200015 193.108 3.875 5.511 0.310 E240901200016 216.311 3.628 5.249 0.273 E240901200017 238.159 3.426 4.451 0.222 E240901200018 259.240 3.602 5.006 0.217 E240901200019 279.401 3.126 5.296 0.215 E240901200020 298.481 3.028 3.774 0.150 E240901200021 316.984 2.944 4.599 0.158 E240901200022 335.221 3.147 4.478 0.140 E240901200023 352.753 2.920 4.861 0.134 E240901200024 369.613 2.837 4.312 0.116 E240901200025 386.303 2.755 4.311 0.099 E240901200026 ENDDATA 17 0 E240901200027 ENDSUBENT 26 0 E240901299999 SUBENT E2409013 20130906 E077E240901300001 BIB 4 5 E240901300002 REACTION (82-PB-0(6-C-12,X)34-SE-75,CUM,SIG) E240901300003 DECAY-DATA (34-SE-75,119.79D,DG,136.,, E240901300004 DG,266.) E240901300005 ERR-ANALYS (ERR-T) Total uncertainty E240901300006 STATUS (TABLE) Plotted in Fig.8(f) of NIM/B, 300 (2013) 35 E240901300007 ENDBIB 5 0 E240901300008 NOCOMMON 0 0 E240901300009 DATA 4 32 E240901300010 EN EN-ERR DATA ERR-T E240901300011 MEV/A MEV/A MB MB E240901300012 20.170 19.577 6.850 0.277 E240901300013 50.515 10.767 10.300 0.340 E240901300014 69.012 7.730 10.400 0.338 E240901300015 83.563 6.820 8.980 0.297 E240901300016 96.490 6.106 8.430 0.237 E240901300017 108.770 6.174 8.490 0.256 E240901300018 120.229 5.285 8.810 0.295 E240901300019 130.505 4.992 7.800 0.248 E240901300020 140.738 5.242 7.780 0.300 E240901300021 150.501 4.522 7.090 0.220 E240901300022 159.387 4.365 7.820 0.244 E240901300023 168.408 4.657 7.310 0.215 E240901300024 185.249 3.984 7.730 0.222 E240901300025 201.136 4.154 8.080 0.184 E240901300026 216.311 3.628 7.990 0.206 E240901300027 231.247 3.486 8.610 0.175 E240901300028 245.292 3.707 7.980 0.189 E240901300029 259.240 3.602 8.920 0.216 E240901300030 273.107 3.169 9.780 0.245 E240901300031 285.930 3.404 8.210 0.173 E240901300032 298.481 3.028 9.430 0.208 E240901300033 310.773 3.267 10.200 0.188 E240901300034 323.129 3.201 9.180 0.184 E240901300035 335.221 3.147 9.730 0.180 E240901300036 346.940 2.894 8.840 0.160 E240901300037 358.485 2.813 10.300 0.190 E240901300038 364.037 2.740 7.590 0.125 E240901300039 369.613 2.837 10.500 0.171 E240901300040 375.262 2.812 10.400 0.175 E240901300041 380.811 2.737 10.100 0.166 E240901300042 391.820 2.762 11.500 0.153 E240901300043 397.291 2.709 10.400 0.138 E240901300044 ENDDATA 34 0 E240901300045 ENDSUBENT 44 0 E240901399999 SUBENT E2409014 20130906 E077E240901400001 BIB 4 4 E240901400002 REACTION (82-PB-0(6-C-12,X)33-AS-76,,SIG) E240901400003 DECAY-DATA (33-AS-76,1.094D,DG,559.) E240901400004 ERR-ANALYS (ERR-T) Total uncertainty E240901400005 STATUS (TABLE) Plotted in Fig.9(a) of NIM/B, 300 (2013) 35 E240901400006 ENDBIB 4 0 E240901400007 NOCOMMON 0 0 E240901400008 DATA 4 22 E240901400009 EN EN-ERR DATA ERR-T E240901400010 MEV/A MEV/A MB MB E240901400011 20.170 19.577 7.859 0.545 E240901400012 69.012 7.730 6.525 0.501 E240901400013 96.490 6.106 4.699 0.343 E240901400014 120.229 5.285 5.903 0.435 E240901400015 140.738 5.242 7.589 0.441 E240901400016 159.387 4.365 3.582 0.294 E240901400017 177.165 4.101 7.246 0.369 E240901400018 193.108 3.875 7.378 0.435 E240901400019 208.986 3.697 9.564 0.430 E240901400020 223.850 3.911 6.671 0.386 E240901400021 238.159 3.426 6.987 0.306 E240901400022 266.390 3.549 6.229 0.251 E240901400023 279.401 3.126 4.756 0.269 E240901400024 292.393 3.060 7.910 0.277 E240901400025 304.507 2.999 7.181 0.326 E240901400026 316.984 2.944 8.789 0.271 E240901400027 329.202 2.873 6.222 0.254 E240901400028 352.753 2.920 7.187 0.249 E240901400029 364.037 2.740 7.087 0.170 E240901400030 375.262 2.812 7.485 0.233 E240901400031 386.303 2.755 6.950 0.149 E240901400032 397.291 2.709 5.944 0.193 E240901400033 ENDDATA 24 0 E240901400034 ENDSUBENT 33 0 E240901499999 SUBENT E2409015 20130906 E077E240901500001 BIB 4 6 E240901500002 REACTION (82-PB-0(6-C-12,X)37-RB-83,CUM,SIG) E240901500003 DECAY-DATA (37-RB-83,86.2D,DG,520.,, E240901500004 DG,528.,, E240901500005 DG,552.) E240901500006 ERR-ANALYS (ERR-T) Total uncertainty E240901500007 STATUS (TABLE) Plotted in Fig.9(b) of NIM/B, 300 (2013) 35 E240901500008 ENDBIB 6 0 E240901500009 NOCOMMON 0 0 E240901500010 DATA 4 32 E240901500011 EN EN-ERR DATA ERR-T E240901500012 MEV/A MEV/A MB MB E240901500013 20.170 19.577 17.900 1.870 E240901500014 50.515 10.767 27.800 2.590 E240901500015 69.012 7.730 23.900 2.280 E240901500016 83.563 6.820 22.400 2.220 E240901500017 96.490 6.106 20.200 1.780 E240901500018 108.770 6.174 17.900 1.700 E240901500019 120.229 5.285 17.400 1.630 E240901500020 130.505 4.992 16.800 1.560 E240901500021 140.738 5.242 16.200 1.800 E240901500022 150.501 4.522 13.800 1.340 E240901500023 159.387 4.365 16.100 1.540 E240901500024 168.408 4.657 15.100 1.300 E240901500025 185.249 3.984 14.700 1.300 E240901500026 201.136 4.154 15.500 1.020 E240901500027 216.311 3.628 15.600 1.190 E240901500028 231.247 3.486 14.700 0.950 E240901500029 245.292 3.707 14.800 1.160 E240901500030 259.240 3.602 13.900 1.140 E240901500031 273.107 3.169 15.900 1.220 E240901500032 285.930 3.404 15.200 1.080 E240901500033 298.481 3.028 15.100 1.080 E240901500034 310.773 3.267 16.100 0.962 E240901500035 323.129 3.201 15.000 0.933 E240901500036 335.221 3.147 17.200 1.050 E240901500037 346.940 2.894 15.600 0.937 E240901500038 358.485 2.813 16.400 1.000 E240901500039 364.037 2.740 12.000 0.648 E240901500040 369.613 2.837 16.500 0.887 E240901500041 375.262 2.812 15.300 0.864 E240901500042 380.811 2.737 16.400 0.875 E240901500043 391.820 2.762 17.700 0.769 E240901500044 397.291 2.709 16.000 0.693 E240901500045 ENDDATA 34 0 E240901500046 ENDSUBENT 45 0 E240901599999 SUBENT E2409016 20130906 E077E240901600001 BIB 4 4 E240901600002 REACTION (82-PB-0(6-C-12,X)38-SR-85,CUM,SIG) E240901600003 DECAY-DATA (38-SR-85-G,64.85D,DG,514.) E240901600004 ERR-ANALYS (ERR-T) Total uncertainty E240901600005 STATUS (TABLE) Plotted in Fig.9(c) of NIM/B, 300 (2013) 35 E240901600006 ENDBIB 4 0 E240901600007 NOCOMMON 0 0 E240901600008 DATA 4 32 E240901600009 EN EN-ERR DATA ERR-T E240901600010 MEV/A MEV/A MB MB E240901600011 20.170 19.577 17.500 1.020 E240901600012 50.515 10.767 25.500 1.400 E240901600013 69.012 7.730 24.600 1.320 E240901600014 83.563 6.820 20.800 1.110 E240901600015 96.490 6.106 19.900 1.000 E240901600016 108.770 6.174 18.200 0.918 E240901600017 120.229 5.285 17.500 0.893 E240901600018 130.505 4.992 16.100 0.804 E240901600019 140.738 5.242 15.100 0.807 E240901600020 150.501 4.522 14.000 0.671 E240901600021 159.387 4.365 15.100 0.709 E240901600022 168.408 4.657 14.600 0.659 E240901600023 185.249 3.984 14.900 0.648 E240901600024 201.136 4.154 14.800 0.569 E240901600025 216.311 3.628 15.200 0.589 E240901600026 231.247 3.486 15.600 0.526 E240901600027 245.292 3.707 15.500 0.539 E240901600028 259.240 3.602 15.700 0.528 E240901600029 273.107 3.169 16.400 0.549 E240901600030 285.930 3.404 15.300 0.452 E240901600031 298.481 3.028 15.300 0.448 E240901600032 310.773 3.267 16.100 0.399 E240901600033 323.129 3.201 16.900 0.415 E240901600034 335.221 3.147 17.900 0.407 E240901600035 346.940 2.894 16.000 0.343 E240901600036 358.485 2.813 16.800 0.355 E240901600037 364.037 2.740 11.600 0.224 E240901600038 369.613 2.837 16.300 0.308 E240901600039 375.262 2.812 16.600 0.312 E240901600040 380.811 2.737 16.600 0.300 E240901600041 391.820 2.762 18.500 0.273 E240901600042 397.291 2.709 16.700 0.245 E240901600043 ENDDATA 34 0 E240901600044 ENDSUBENT 43 0 E240901699999 SUBENT E2409017 20130906 E077E240901700001 BIB 4 5 E240901700002 REACTION (82-PB-0(6-C-12,X)52-TE-121-M,IND,SIG) E240901700003 DECAY-DATA (52-TE-121-M,164.2D,DG,212.,, E240901700004 DG,573.) E240901700005 ERR-ANALYS (ERR-T) Total uncertainty E240901700006 STATUS (TABLE) Plotted in Fig.9(d) of NIM/B, 300 (2013) 35 E240901700007 ENDBIB 5 0 E240901700008 NOCOMMON 0 0 E240901700009 DATA 4 32 E240901700010 EN EN-ERR DATA ERR-T E240901700011 MEV/A MEV/A MB MB E240901700012 20.170 19.577 2.250 0.193 E240901700013 50.515 10.767 0.876 0.110 E240901700014 69.012 7.730 1.210 0.086 E240901700015 83.563 6.820 1.270 0.078 E240901700016 96.490 6.106 1.080 0.056 E240901700017 108.770 6.174 0.510 0.044 E240901700018 120.229 5.285 0.791 0.057 E240901700019 130.505 4.992 1.250 0.064 E240901700020 140.738 5.242 0.877 0.069 E240901700021 150.501 4.522 0.930 0.051 E240901700022 159.387 4.365 1.140 0.059 E240901700023 168.408 4.657 1.230 0.055 E240901700024 185.249 3.984 1.910 0.071 E240901700025 201.136 4.154 1.560 0.046 E240901700026 216.311 3.628 1.930 0.065 E240901700027 231.247 3.486 1.990 0.048 E240901700028 245.292 3.707 1.320 0.051 E240901700029 259.240 3.602 1.660 0.058 E240901700030 273.107 3.169 1.600 0.065 E240901700031 285.930 3.404 1.740 0.056 E240901700032 298.481 3.028 1.370 0.054 E240901700033 310.773 3.267 1.450 0.046 E240901700034 323.129 3.201 1.570 0.053 E240901700035 335.221 3.147 1.770 0.055 E240901700036 346.940 2.894 1.600 0.049 E240901700037 358.485 2.813 1.570 0.052 E240901700038 364.037 2.740 1.070 0.033 E240901700039 369.613 2.837 1.490 0.045 E240901700040 375.262 2.812 1.450 0.045 E240901700041 380.811 2.737 1.620 0.047 E240901700042 391.820 2.762 1.860 0.043 E240901700043 397.291 2.709 1.680 0.039 E240901700044 ENDDATA 34 0 E240901700045 ENDSUBENT 44 0 E240901799999 SUBENT E2409018 20130906 E077E240901800001 BIB 4 4 E240901800002 REACTION (82-PB-0(6-C-12,X)53-I-126,,SIG) E240901800003 DECAY-DATA (53-I-126,12.93D,DG,666.) E240901800004 ERR-ANALYS (ERR-T) Total uncertainty E240901800005 STATUS (TABLE) Plotted in Fig.9(e) of NIM/B, 300 (2013) 35 E240901800006 ENDBIB 4 0 E240901800007 NOCOMMON 0 0 E240901800008 DATA 4 14 E240901800009 EN EN-ERR DATA ERR-T E240901800010 MEV/A MEV/A MB MB E240901800011 108.770 6.174 0.362 0.029 E240901800012 140.738 5.242 1.173 0.065 E240901800013 168.408 4.657 1.285 0.066 E240901800014 193.108 3.875 1.153 0.057 E240901800015 216.311 3.628 0.782 0.040 E240901800016 238.159 3.426 0.872 0.042 E240901800017 259.240 3.602 1.052 0.042 E240901800018 279.401 3.126 0.786 0.035 E240901800019 298.481 3.028 0.926 0.037 E240901800020 316.984 2.944 0.719 0.030 E240901800021 335.221 3.147 0.729 0.028 E240901800022 352.753 2.920 0.728 0.027 E240901800023 369.613 2.837 0.644 0.025 E240901800024 386.303 2.755 0.651 0.022 E240901800025 ENDDATA 16 0 E240901800026 ENDSUBENT 25 0 E240901899999 SUBENT E2409019 20130906 E077E240901900001 BIB 4 6 E240901900002 REACTION (82-PB-0(6-C-12,X)54-XE-127,CUM,SIG) E240901900003 DECAY-DATA (54-XE-127-G,36.35D,DG,172.,, E240901900004 DG,202.,, E240901900005 DG,372.) E240901900006 ERR-ANALYS (ERR-T) Total uncertainty E240901900007 STATUS (TABLE) Plotted in Fig.9(f) of NIM/B, 300 (2013) 35 E240901900008 ENDBIB 6 0 E240901900009 NOCOMMON 0 0 E240901900010 DATA 4 32 E240901900011 EN EN-ERR DATA ERR-T E240901900012 MEV/A MEV/A MB MB E240901900013 20.170 19.577 16.600 0.776 E240901900014 50.515 10.767 9.790 0.419 E240901900015 69.012 7.730 12.100 0.529 E240901900016 83.563 6.820 12.500 0.590 E240901900017 96.490 6.106 12.100 0.449 E240901900018 108.770 6.174 10.300 0.414 E240901900019 120.229 5.285 11.600 0.506 E240901900020 130.505 4.992 12.300 0.533 E240901900021 140.738 5.242 12.900 0.637 E240901900022 150.501 4.522 11.900 0.471 E240901900023 159.387 4.365 15.400 0.585 E240901900024 168.408 4.657 14.400 0.517 E240901900025 185.249 3.984 17.800 0.634 E240901900026 201.136 4.154 16.000 0.433 E240901900027 216.311 3.628 18.000 0.568 E240901900028 231.247 3.486 17.200 0.421 E240901900029 245.292 3.707 14.700 0.452 E240901900030 259.240 3.602 15.800 0.499 E240901900031 273.107 3.169 15.800 0.538 E240901900032 285.930 3.404 17.400 0.496 E240901900033 298.481 3.028 14.500 0.456 E240901900034 310.773 3.267 16.500 0.413 E240901900035 323.129 3.201 16.600 0.455 E240901900036 335.221 3.147 16.800 0.451 E240901900037 346.940 2.894 15.200 0.403 E240901900038 358.485 2.813 14.800 0.419 E240901900039 364.037 2.740 11.800 0.288 E240901900040 369.613 2.837 15.800 0.384 E240901900041 375.262 2.812 16.100 0.400 E240901900042 380.811 2.737 16.300 0.388 E240901900043 391.820 2.762 17.900 0.352 E240901900044 397.291 2.709 16.200 0.317 E240901900045 ENDDATA 34 0 E240901900046 ENDSUBENT 45 0 E240901999999 SUBENT E2409020 20130906 E077E240902000001 BIB 4 5 E240902000002 REACTION (82-PB-0(6-C-12,X)56-BA-133,CUM,SIG) E240902000003 DECAY-DATA (56-BA-133-G,3853.D,DG,303.,, E240902000004 DG,356.) E240902000005 ERR-ANALYS (ERR-T) Total uncertainty E240902000006 STATUS (TABLE) Plotted in Fig.10(a) of NIM/B, 300 (2013) 35 E240902000007 ENDBIB 5 0 E240902000008 NOCOMMON 0 0 E240902000009 DATA 4 32 E240902000010 EN EN-ERR DATA ERR-T E240902000011 MEV/A MEV/A MB MB E240902000012 20.170 19.577 10.040 0.676 E240902000013 50.515 10.767 13.614 1.056 E240902000014 69.012 7.730 3.824 0.353 E240902000015 83.563 6.820 11.097 0.761 E240902000016 96.490 6.106 8.522 0.516 E240902000017 108.770 6.174 6.309 0.543 E240902000018 120.229 5.285 13.145 0.864 E240902000019 130.505 4.992 10.845 0.678 E240902000020 140.738 5.242 7.055 0.833 E240902000021 150.501 4.522 13.310 0.660 E240902000022 159.387 4.365 14.059 0.893 E240902000023 168.408 4.657 15.875 0.857 E240902000024 185.249 3.984 12.303 0.678 E240902000025 201.136 4.154 20.097 0.698 E240902000026 216.311 3.628 17.820 0.730 E240902000027 231.247 3.486 15.988 0.494 E240902000028 245.292 3.707 18.638 0.788 E240902000029 259.240 3.602 19.212 0.784 E240902000030 273.107 3.169 15.092 0.867 E240902000031 285.930 3.404 16.930 0.762 E240902000032 298.481 3.028 17.424 0.843 E240902000033 310.773 3.267 19.672 0.702 E240902000034 323.129 3.201 15.221 0.567 E240902000035 335.221 3.147 20.850 0.802 E240902000036 346.940 2.894 18.939 0.726 E240902000037 358.485 2.813 16.229 0.834 E240902000038 364.037 2.740 13.772 0.527 E240902000039 369.613 2.837 19.353 0.740 E240902000040 375.262 2.812 19.221 0.773 E240902000041 380.811 2.737 17.477 0.800 E240902000042 391.820 2.762 17.513 0.580 E240902000043 397.291 2.709 15.807 0.525 E240902000044 ENDDATA 34 0 E240902000045 ENDSUBENT 44 0 E240902099999 SUBENT E2409021 20130906 E077E240902100001 BIB 4 4 E240902100002 REACTION (82-PB-0(6-C-12,X)58-CE-139,CUM,SIG) E240902100003 DECAY-DATA (58-CE-139-G,137.6D,DG,166.) E240902100004 ERR-ANALYS (ERR-T) Total uncertainty E240902100005 STATUS (TABLE) Plotted in Fig.10(b) of NIM/B, 300 (2013) 35 E240902100006 ENDBIB 4 0 E240902100007 NOCOMMON 0 0 E240902100008 DATA 4 32 E240902100009 EN EN-ERR DATA ERR-T E240902100010 MEV/A MEV/A MB MB E240902100011 20.170 19.577 3.050 0.174 E240902100012 50.515 10.767 1.890 0.106 E240902100013 69.012 7.730 1.850 0.102 E240902100014 83.563 6.820 2.210 0.120 E240902100015 96.490 6.106 2.960 0.149 E240902100016 108.770 6.174 4.030 0.199 E240902100017 120.229 5.285 4.720 0.231 E240902100018 130.505 4.992 5.540 0.263 E240902100019 140.738 5.242 6.080 0.289 E240902100020 150.501 4.522 6.370 0.285 E240902100021 159.387 4.365 7.330 0.319 E240902100022 168.408 4.657 7.410 0.312 E240902100023 185.249 3.984 7.630 0.306 E240902100024 201.136 4.154 7.690 0.285 E240902100025 216.311 3.628 7.560 0.268 E240902100026 231.247 3.486 7.330 0.238 E240902100027 245.292 3.707 6.880 0.215 E240902100028 259.240 3.602 6.940 0.203 E240902100029 273.107 3.169 7.280 0.201 E240902100030 285.930 3.404 6.730 0.168 E240902100031 298.481 3.028 6.610 0.155 E240902100032 310.773 3.267 6.760 0.139 E240902100033 323.129 3.201 6.810 0.130 E240902100034 335.221 3.147 7.200 0.123 E240902100035 346.940 2.894 6.520 0.100 E240902100036 358.485 2.813 6.580 0.094 E240902100037 364.037 2.740 4.730 0.061 E240902100038 369.613 2.837 6.550 0.080 E240902100039 375.262 2.812 6.400 0.076 E240902100040 380.811 2.737 6.540 0.074 E240902100041 391.820 2.762 7.060 0.066 E240902100042 397.291 2.709 6.360 0.058 E240902100043 ENDDATA 34 0 E240902100044 ENDSUBENT 43 0 E240902199999 SUBENT E2409022 20130906 E077E240902200001 BIB 4 4 E240902200002 REACTION (82-PB-0(6-C-12,X)58-CE-141,CUM,SIG) E240902200003 DECAY-DATA (58-CE-141,32.51D,DG,145.) E240902200004 ERR-ANALYS (ERR-T) Total uncertainty E240902200005 STATUS (TABLE) Plotted in Fig.10(c) of NIM/B, 300 (2013) 35 E240902200006 ENDBIB 4 0 E240902200007 NOCOMMON 0 0 E240902200008 DATA 4 14 E240902200009 EN EN-ERR DATA ERR-T E240902200010 MEV/A MEV/A MB MB E240902200011 69.012 7.730 0.117 0.007 E240902200012 140.738 5.242 0.044 0.003 E240902200013 168.408 4.657 0.046 0.003 E240902200014 193.108 3.875 0.062 0.003 E240902200015 216.311 3.628 0.078 0.004 E240902200016 238.159 3.426 0.097 0.004 E240902200017 259.240 3.602 0.092 0.003 E240902200018 279.401 3.126 0.094 0.003 E240902200019 298.481 3.028 0.102 0.003 E240902200020 316.984 2.944 0.060 0.002 E240902200021 335.221 3.147 0.061 0.002 E240902200022 352.753 2.920 0.050 0.002 E240902200023 369.613 2.837 0.067 0.002 E240902200024 386.303 2.755 0.037 0.001 E240902200025 ENDDATA 16 0 E240902200026 ENDSUBENT 25 0 E240902299999 SUBENT E2409023 20130906 E077E240902300001 BIB 4 4 E240902300002 REACTION (82-PB-0(6-C-12,X)61-PM-143,CUM,SIG) E240902300003 DECAY-DATA (61-PM-143,265.D,DG,742.) E240902300004 ERR-ANALYS (ERR-T) Total uncertainty E240902300005 STATUS (TABLE) Plotted in Fig.10(d) of NIM/B, 300 (2013) 35 E240902300006 ENDBIB 4 0 E240902300007 NOCOMMON 0 0 E240902300008 DATA 4 32 E240902300009 EN EN-ERR DATA ERR-T E240902300010 MEV/A MEV/A MB MB E240902300011 20.170 19.577 4.660 0.427 E240902300012 50.515 10.767 4.000 0.336 E240902300013 69.012 7.730 5.090 0.400 E240902300014 83.563 6.820 7.130 0.536 E240902300015 96.490 6.106 7.550 0.449 E240902300016 108.770 6.174 11.600 0.698 E240902300017 120.229 5.285 13.000 0.831 E240902300018 130.505 4.992 16.800 0.984 E240902300019 140.738 5.242 16.200 1.100 E240902300020 150.501 4.522 17.300 0.950 E240902300021 159.387 4.365 20.700 1.100 E240902300022 168.408 4.657 19.900 1.010 E240902300023 185.249 3.984 19.900 0.992 E240902300024 201.136 4.154 20.000 0.824 E240902300025 216.311 3.628 19.900 0.889 E240902300026 231.247 3.486 19.500 0.711 E240902300027 245.292 3.707 16.800 0.717 E240902300028 259.240 3.602 17.300 0.723 E240902300029 273.107 3.169 19.400 0.838 E240902300030 285.930 3.404 16.200 0.628 E240902300031 298.481 3.028 15.500 0.639 E240902300032 310.773 3.267 18.400 0.597 E240902300033 323.129 3.201 16.200 0.585 E240902300034 335.221 3.147 18.900 0.617 E240902300035 346.940 2.894 17.100 0.543 E240902300036 358.485 2.813 18.300 0.590 E240902300037 364.037 2.740 11.600 0.354 E240902300038 369.613 2.837 16.100 0.488 E240902300039 375.262 2.812 14.900 0.470 E240902300040 380.811 2.737 15.300 0.473 E240902300041 391.820 2.762 17.600 0.435 E240902300042 397.291 2.709 15.800 0.390 E240902300043 ENDDATA 34 0 E240902300044 ENDSUBENT 43 0 E240902399999 SUBENT E2409024 20130906 E077E240902400001 BIB 4 5 E240902400002 REACTION (82-PB-0(6-C-12,X)61-PM-144,,SIG) E240902400003 DECAY-DATA (61-PM-144,363.D,DG,617.,, E240902400004 DG,696.) E240902400005 ERR-ANALYS (ERR-T) Total uncertainty E240902400006 STATUS (TABLE) Plotted in Fig.10(e) of NIM/B, 300 (2013) 35 E240902400007 ENDBIB 5 0 E240902400008 NOCOMMON 0 0 E240902400009 DATA 4 32 E240902400010 EN EN-ERR DATA ERR-T E240902400011 MEV/A MEV/A MB MB E240902400012 20.170 19.577 2.800 0.141 E240902400013 50.515 10.767 2.360 0.086 E240902400014 69.012 7.730 2.320 0.096 E240902400015 83.563 6.820 3.910 0.146 E240902400016 96.490 6.106 2.380 0.077 E240902400017 108.770 6.174 1.870 0.070 E240902400018 120.229 5.285 2.420 0.095 E240902400019 130.505 4.992 1.690 0.072 E240902400020 140.738 5.242 2.330 0.131 E240902400021 150.501 4.522 3.290 0.116 E240902400022 159.387 4.365 1.790 0.071 E240902400023 168.408 4.657 1.720 0.068 E240902400024 185.249 3.984 2.500 0.107 E240902400025 201.136 4.154 1.850 0.054 E240902400026 216.311 3.628 2.030 0.075 E240902400027 231.247 3.486 1.770 0.048 E240902400028 245.292 3.707 1.770 0.066 E240902400029 259.240 3.602 1.450 0.051 E240902400030 273.107 3.169 1.890 0.069 E240902400031 285.930 3.404 1.880 0.067 E240902400032 298.481 3.028 1.730 0.067 E240902400033 310.773 3.267 1.490 0.048 E240902400034 323.129 3.201 1.350 0.059 E240902400035 335.221 3.147 1.640 0.064 E240902400036 346.940 2.894 1.490 0.058 E240902400037 358.485 2.813 1.740 0.069 E240902400038 364.037 2.740 1.040 0.045 E240902400039 369.613 2.837 1.460 0.063 E240902400040 375.262 2.812 1.510 0.058 E240902400041 380.811 2.737 1.520 0.053 E240902400042 391.820 2.762 1.420 0.043 E240902400043 397.291 2.709 1.280 0.039 E240902400044 ENDDATA 34 0 E240902400045 ENDSUBENT 44 0 E240902499999 SUBENT E2409025 20130906 E077E240902500001 BIB 4 4 E240902500002 REACTION (82-PB-0(6-C-12,X)64-GD-146,CUM,SIG) E240902500003 DECAY-DATA (64-GD-146,48.27D,DG,747.) E240902500004 ERR-ANALYS (ERR-T) Total uncertainty E240902500005 STATUS (TABLE) Plotted in Fig.10(f) of NIM/B, 300 (2013) 35 E240902500006 ENDBIB 4 0 E240902500007 NOCOMMON 0 0 E240902500008 DATA 4 31 E240902500009 EN EN-ERR DATA ERR-T E240902500010 MEV/A MEV/A MB MB E240902500011 20.170 19.577 3.240 0.328 E240902500012 50.515 10.767 3.860 0.320 E240902500013 69.012 7.730 5.040 0.388 E240902500014 83.563 6.820 7.130 0.527 E240902500015 96.490 6.106 14.100 0.769 E240902500016 108.770 6.174 18.800 1.030 E240902500017 120.229 5.285 22.900 1.290 E240902500018 130.505 4.992 26.800 1.430 E240902500019 140.738 5.242 24.600 1.460 E240902500020 159.387 4.365 28.900 1.430 E240902500021 168.408 4.657 28.500 1.350 E240902500022 185.249 3.984 28.000 1.290 E240902500023 201.136 4.154 27.700 1.090 E240902500024 216.311 3.628 25.900 1.080 E240902500025 231.247 3.486 26.400 0.923 E240902500026 245.292 3.707 25.000 0.953 E240902500027 259.240 3.602 23.800 0.902 E240902500028 273.107 3.169 25.500 0.994 E240902500029 285.930 3.404 23.900 0.811 E240902500030 298.481 3.028 23.300 0.813 E240902500031 310.773 3.267 23.500 0.690 E240902500032 323.129 3.201 23.700 0.723 E240902500033 335.221 3.147 23.600 0.687 E240902500034 346.940 2.894 21.300 0.600 E240902500035 358.485 2.813 24.300 0.669 E240902500036 364.037 2.740 16.400 0.423 E240902500037 369.613 2.837 22.200 0.563 E240902500038 375.262 2.812 21.900 0.567 E240902500039 380.811 2.737 21.900 0.548 E240902500040 391.820 2.762 22.900 0.479 E240902500041 397.291 2.709 20.600 0.430 E240902500042 ENDDATA 33 0 E240902500043 ENDSUBENT 42 0 E240902599999 SUBENT E2409026 20130906 E077E240902600001 BIB 4 5 E240902600002 REACTION (82-PB-0(6-C-12,X)64-GD-147,CUM,SIG) E240902600003 DECAY-DATA (64-GD-147,1.586D,DG,929.,, E240902600004 DG,1131.) E240902600005 ERR-ANALYS (ERR-T) Total uncertainty E240902600006 STATUS (TABLE) Plotted in Fig.11(a) of NIM/B, 300 (2013) 35 E240902600007 ENDBIB 5 0 E240902600008 NOCOMMON 0 0 E240902600009 DATA 4 21 E240902600010 EN EN-ERR DATA ERR-T E240902600011 MEV/A MEV/A MB MB E240902600012 69.012 7.730 15.345 1.151 E240902600013 96.490 6.106 8.766 0.603 E240902600014 120.229 5.285 14.184 1.064 E240902600015 140.738 5.242 18.258 0.776 E240902600016 159.387 4.365 9.985 0.872 E240902600017 177.165 4.101 14.540 0.580 E240902600018 193.108 3.875 17.603 1.083 E240902600019 208.986 3.697 16.466 0.629 E240902600020 223.850 3.911 20.537 1.172 E240902600021 238.159 3.426 14.692 0.579 E240902600022 266.390 3.549 14.540 0.541 E240902600023 279.401 3.126 6.346 0.609 E240902600024 292.393 3.060 16.199 0.583 E240902600025 304.507 2.999 11.451 0.809 E240902600026 316.984 2.944 13.896 0.535 E240902600027 329.202 2.873 15.360 0.819 E240902600028 352.753 2.920 8.935 0.586 E240902600029 364.037 2.740 12.301 0.401 E240902600030 375.262 2.812 13.696 0.693 E240902600031 386.303 2.755 13.593 0.392 E240902600032 397.291 2.709 17.178 0.741 E240902600033 ENDDATA 23 0 E240902600034 ENDSUBENT 33 0 E240902699999 SUBENT E2409027 20130906 E077E240902700001 BIB 4 4 E240902700002 REACTION (82-PB-0(6-C-12,X)64-GD-149,CUM,SIG) E240902700003 DECAY-DATA (64-GD-149,9.28D,DG,299.) E240902700004 ERR-ANALYS (ERR-T) Total uncertainty E240902700005 STATUS (TABLE) Plotted in Fig.11(b) of NIM/B, 300 (2013) 35 E240902700006 ENDBIB 4 0 E240902700007 NOCOMMON 0 0 E240902700008 DATA 4 14 E240902700009 EN EN-ERR DATA ERR-T E240902700010 MEV/A MEV/A MB MB E240902700011 108.770 6.174 3.373 0.392 E240902700012 140.738 5.242 9.253 0.682 E240902700013 168.408 4.657 9.694 0.664 E240902700014 193.108 3.875 15.524 0.897 E240902700015 216.311 3.628 10.437 0.647 E240902700016 238.159 3.426 15.122 0.819 E240902700017 259.240 3.602 6.838 0.450 E240902700018 279.401 3.126 9.937 0.581 E240902700019 298.481 3.028 15.086 0.716 E240902700020 316.984 2.944 11.415 0.581 E240902700021 335.221 3.147 2.070 0.231 E240902700022 352.753 2.920 5.762 0.379 E240902700023 369.613 2.837 15.570 0.632 E240902700024 386.303 2.755 14.882 0.543 E240902700025 ENDDATA 16 0 E240902700026 ENDSUBENT 25 0 E240902799999 SUBENT E2409028 20130906 E077E240902800001 BIB 4 4 E240902800002 REACTION (82-PB-0(6-C-12,X)65-TB-151,CUM,SIG) E240902800003 DECAY-DATA (65-TB-151-G,0.7337D,DG,395.) E240902800004 ERR-ANALYS (ERR-T) Total uncertainty E240902800005 STATUS (TABLE) Plotted in Fig.11(c) of NIM/B, 300 (2013) 35 E240902800006 ENDBIB 4 0 E240902800007 NOCOMMON 0 0 E240902800008 DATA 4 20 E240902800009 EN EN-ERR DATA ERR-T E240902800010 MEV/A MEV/A MB MB E240902800011 69.012 7.730 46.765 2.385 E240902800012 120.229 5.285 40.895 2.086 E240902800013 140.738 5.242 58.872 2.677 E240902800014 159.387 4.365 48.382 2.307 E240902800015 177.165 4.101 84.631 3.385 E240902800016 193.108 3.875 36.329 1.772 E240902800017 208.986 3.697 54.402 2.310 E240902800018 223.850 3.911 45.025 2.067 E240902800019 238.159 3.426 55.676 2.314 E240902800020 266.390 3.549 57.546 2.320 E240902800021 279.401 3.126 36.758 1.670 E240902800022 292.393 3.060 49.797 2.042 E240902800023 304.507 2.999 29.927 1.400 E240902800024 316.984 2.944 53.375 2.149 E240902800025 329.202 2.873 29.305 1.288 E240902800026 352.753 2.920 30.956 1.306 E240902800027 364.037 2.740 47.837 1.841 E240902800028 375.262 2.812 25.071 1.068 E240902800029 386.303 2.755 49.067 1.849 E240902800030 397.291 2.709 28.197 1.153 E240902800031 ENDDATA 22 0 E240902800032 ENDSUBENT 31 0 E240902899999 SUBENT E2409029 20130906 E077E240902900001 BIB 4 4 E240902900002 REACTION (82-PB-0(6-C-12,X)71-LU-169,CUM,SIG) E240902900003 DECAY-DATA (71-LU-169-G,1.419D,DG,961.) E240902900004 ERR-ANALYS (ERR-T) Total uncertainty E240902900005 STATUS (TABLE) Plotted in Fig.11(d) of NIM/B, 300 (2013) 35 E240902900006 ENDBIB 4 0 E240902900007 NOCOMMON 0 0 E240902900008 DATA 4 12 E240902900009 EN EN-ERR DATA ERR-T E240902900010 MEV/A MEV/A MB MB E240902900011 20.170 19.577 6.067 0.570 E240902900012 69.012 7.730 64.269 3.219 E240902900013 96.490 6.106 52.733 2.375 E240902900014 140.738 5.242 55.664 2.372 E240902900015 177.165 4.101 48.485 1.995 E240902900016 208.986 3.697 44.837 1.876 E240902900017 238.159 3.426 45.358 1.878 E240902900018 266.390 3.549 45.367 1.843 E240902900019 292.393 3.060 43.910 1.800 E240902900020 316.984 2.944 43.765 1.790 E240902900021 364.037 2.740 36.878 1.453 E240902900022 386.303 2.755 33.831 1.322 E240902900023 ENDDATA 14 0 E240902900024 ENDSUBENT 23 0 E240902999999 SUBENT E2409030 20130906 E077E240903000001 BIB 4 5 E240903000002 REACTION (82-PB-0(6-C-12,X)70-YB-169,CUM,SIG) E240903000003 DECAY-DATA (70-YB-169-G,32.02D,DG,178.,, E240903000004 DG,308.) E240903000005 ERR-ANALYS (ERR-T) Total uncertainty E240903000006 STATUS (TABLE) Plotted in Fig.11(e) of NIM/B, 300 (2013) 35 E240903000007 ENDBIB 5 0 E240903000008 NOCOMMON 0 0 E240903000009 DATA 4 32 E240903000010 EN EN-ERR DATA ERR-T E240903000011 MEV/A MEV/A MB MB E240903000012 20.170 19.577 1.270 0.425 E240903000013 50.515 10.767 13.500 1.320 E240903000014 69.012 7.730 41.500 2.930 E240903000015 83.563 6.820 37.100 2.850 E240903000016 96.490 6.106 56.800 3.210 E240903000017 108.770 6.174 44.000 2.820 E240903000018 120.229 5.285 42.000 3.060 E240903000019 130.505 4.992 24.300 2.020 E240903000020 140.738 5.242 49.200 4.010 E240903000021 150.501 4.522 47.400 3.020 E240903000022 159.387 4.365 30.800 2.280 E240903000023 168.408 4.657 43.000 2.660 E240903000024 185.249 3.984 38.200 2.490 E240903000025 201.136 4.154 38.300 1.840 E240903000026 216.311 3.628 51.700 2.780 E240903000027 231.247 3.486 37.400 1.610 E240903000028 245.292 3.707 41.300 2.270 E240903000029 259.240 3.602 40.500 2.350 E240903000030 273.107 3.169 28.700 2.190 E240903000031 285.930 3.404 36.200 2.070 E240903000032 298.481 3.028 24.900 1.820 E240903000033 310.773 3.267 44.900 2.090 E240903000034 323.129 3.201 34.700 2.000 E240903000035 335.221 3.147 36.600 2.020 E240903000036 346.940 2.894 33.400 1.830 E240903000037 358.485 2.813 25.500 1.710 E240903000038 364.037 2.740 34.600 1.570 E240903000039 369.613 2.837 46.100 2.080 E240903000040 375.262 2.812 33.600 1.830 E240903000041 380.811 2.737 32.000 1.710 E240903000042 391.820 2.762 33.800 1.510 E240903000043 397.291 2.709 30.500 1.360 E240903000044 ENDDATA 34 0 E240903000045 ENDSUBENT 44 0 E240903099999 SUBENT E2409031 20130906 E077E240903100001 BIB 4 4 E240903100002 REACTION (82-PB-0(6-C-12,X)72-HF-172,CUM,SIG) E240903100003 DECAY-DATA (72-HF-172,683.0D,DG,1093.) E240903100004 ERR-ANALYS (ERR-T) Total uncertainty E240903100005 STATUS (TABLE) Plotted in Fig.11(f) of NIM/B, 300 (2013) 35 E240903100006 ENDBIB 4 0 E240903100007 NOCOMMON 0 0 E240903100008 DATA 4 31 E240903100009 EN EN-ERR DATA ERR-T E240903100010 MEV/A MEV/A MB MB E240903100011 20.170 19.577 10.200 0.862 E240903100012 50.515 10.767 21.500 1.390 E240903100013 69.012 7.730 33.700 2.020 E240903100014 83.563 6.820 39.500 2.350 E240903100015 96.490 6.106 43.000 2.280 E240903100016 108.770 6.174 42.900 2.330 E240903100017 120.229 5.285 42.500 2.410 E240903100018 130.505 4.992 37.900 2.110 E240903100019 140.738 5.242 36.300 2.290 E240903100020 159.387 4.365 36.200 1.920 E240903100021 168.408 4.657 36.600 1.840 E240903100022 185.249 3.984 35.300 1.750 E240903100023 201.136 4.154 35.600 1.470 E240903100024 216.311 3.628 35.500 1.580 E240903100025 231.247 3.486 32.600 1.200 E240903100026 245.292 3.707 32.000 1.340 E240903100027 259.240 3.602 28.000 1.200 E240903100028 273.107 3.169 31.600 1.410 E240903100029 285.930 3.404 29.400 1.130 E240903100030 298.481 3.028 29.400 1.190 E240903100031 310.773 3.267 29.100 0.993 E240903100032 323.129 3.201 29.700 1.070 E240903100033 335.221 3.147 31.200 1.070 E240903100034 346.940 2.894 28.400 0.945 E240903100035 358.485 2.813 26.700 0.961 E240903100036 364.037 2.740 19.900 0.631 E240903100037 369.613 2.837 27.900 0.878 E240903100038 375.262 2.812 24.000 0.813 E240903100039 380.811 2.737 25.400 0.836 E240903100040 391.820 2.762 26.300 0.730 E240903100041 397.291 2.709 23.800 0.658 E240903100042 ENDDATA 33 0 E240903100043 ENDSUBENT 42 0 E240903199999 SUBENT E2409032 20130906 E077E240903200001 BIB 4 4 E240903200002 REACTION (82-PB-0(6-C-12,X)71-LU-173,CUM,SIG) E240903200003 DECAY-DATA (71-LU-173,500.1D,DG,272.) E240903200004 ERR-ANALYS (ERR-T) Total uncertainty E240903200005 STATUS (TABLE) Plotted in Fig.12(a) of NIM/B, 300 (2013) 35 E240903200006 ENDBIB 4 0 E240903200007 NOCOMMON 0 0 E240903200008 DATA 4 32 E240903200009 EN EN-ERR DATA ERR-T E240903200010 MEV/A MEV/A MB MB E240903200011 20.170 19.577 7.630 0.529 E240903200012 50.515 10.767 16.600 0.964 E240903200013 69.012 7.730 29.800 1.630 E240903200014 83.563 6.820 35.600 1.910 E240903200015 96.490 6.106 34.700 1.750 E240903200016 108.770 6.174 33.600 1.700 E240903200017 120.229 5.285 34.100 1.740 E240903200018 130.505 4.992 31.300 1.560 E240903200019 140.738 5.242 31.400 1.640 E240903200020 150.501 4.522 28.100 1.340 E240903200021 159.387 4.365 30.900 1.440 E240903200022 168.408 4.657 27.400 1.240 E240903200023 185.249 3.984 28.000 1.220 E240903200024 201.136 4.154 29.100 1.110 E240903200025 216.311 3.628 27.200 1.060 E240903200026 231.247 3.486 26.200 0.887 E240903200027 245.292 3.707 25.600 0.906 E240903200028 259.240 3.602 24.800 0.845 E240903200029 273.107 3.169 25.000 0.868 E240903200030 285.930 3.404 24.700 0.744 E240903200031 298.481 3.028 22.500 0.698 E240903200032 310.773 3.267 22.700 0.598 E240903200033 323.129 3.201 24.200 0.640 E240903200034 335.221 3.147 24.100 0.602 E240903200035 346.940 2.894 21.900 0.523 E240903200036 358.485 2.813 23.100 0.552 E240903200037 364.037 2.740 15.600 0.344 E240903200038 369.613 2.837 21.900 0.474 E240903200039 375.262 2.812 20.800 0.458 E240903200040 380.811 2.737 22.400 0.473 E240903200041 391.820 2.762 22.900 0.410 E240903200042 397.291 2.709 20.700 0.369 E240903200043 ENDDATA 34 0 E240903200044 ENDSUBENT 43 0 E240903299999 SUBENT E2409033 20130906 E077E240903300001 BIB 4 4 E240903300002 REACTION (82-PB-0(6-C-12,X)72-HF-175,CUM,SIG) E240903300003 DECAY-DATA (72-HF-175,70.0D,DG,343.) E240903300004 ERR-ANALYS (ERR-T) Total uncertainty E240903300005 STATUS (TABLE) Plotted in Fig.12(b) of NIM/B, 300 (2013) 35 E240903300006 ENDBIB 4 0 E240903300007 NOCOMMON 0 0 E240903300008 DATA 4 15 E240903300009 EN EN-ERR DATA ERR-T E240903300010 MEV/A MEV/A MB MB E240903300011 69.012 7.730 52.500 0.319 E240903300012 108.770 6.174 50.700 0.316 E240903300013 140.738 5.242 48.000 0.293 E240903300014 168.408 4.657 45.100 0.274 E240903300015 193.108 3.875 44.900 0.273 E240903300016 216.311 3.628 43.000 0.261 E240903300017 238.159 3.426 43.000 0.265 E240903300018 259.240 3.602 36.800 0.211 E240903300019 279.401 3.126 40.300 0.249 E240903300020 298.481 3.028 38.100 0.236 E240903300021 316.984 2.944 36.000 0.222 E240903300022 335.221 3.147 29.700 0.186 E240903300023 352.753 2.920 32.900 0.200 E240903300024 369.613 2.837 31.000 0.193 E240903300025 386.303 2.755 29.000 0.174 E240903300026 ENDDATA 17 0 E240903300027 ENDSUBENT 26 0 E240903399999 ENDENTRY 33 0 E240999999999